
When she lowered her head to eat, Jiang Ran was suddenly startled. If she was in Jiang Ran's body, then where was the real Jiang Ran? Did they go into their own bodies? Did they directly exchange souls, or is the original owner already dead? And what about her in the original world? What was her situation like?
Although it is undeniable that this fair-skinned and beautiful body is very eye-catching and is the beauty she wants to be in her fantasy, but she just thinks about it in her mind. This kind of behavior of becoming another person occupying other people's bodies is a little bit... Difficult to accept. She still wants to go back and be a happy salted fish, fishing at work and lying down after get off work. Of course, it is better to be herself.
But now this body does not need to be adjusted at all when used, as if she is the master.
If she traveled through the book as she suspected, then some scientific methods should not be able to make her go back. In the novels she has read, there are several paths for the book traveler to go back, or they can complete the task and be transmitted back by the system. Either the soul on the line between life and death will leave the body and go back, or there will be some formation or the like in the place where the book comes, and the person who wears the book can go back if he gets close to it.
She has been here for at least an hour or two now, and she has not seen herself going back, which means that this last option will not work. The system doesn't have it either. Suicide... I'm sorry, she has no thoughts of committing suicide. Wouldn't it be better to live well? Why do you want to commit suicide? If you can't go back, your death will not be in vain!
After eating half of the meal, Jiang Ran swiped her phone and tried all her previous accounts, from WeChat, Weibo, and QQ, the common social software, to Alipay, 12306, novel reading software, and even the personal tax APP. They all tried it, but none of them could get on.
After thinking about it, Jiang Ran dialed the phone number she had used with trembling hands. The message "The number you dialed is unavailable, please check before dialing" came out of the handset of her mobile phone, which made her feel that this was indeed the case.
Jiang Ran reluctantly called the phone numbers of all her relatives and friends that she remembered. Either the number was empty, or the person connected was a complete stranger. In short, it was the same mobile phone number as her previous life. No one can match the owner.
It really deserves to be an online novel!
It really deserves to be worn in a book.
Jiang Ran curled her lips mockingly.
During meal time, Jiang Ran kept brainstorming, and finally found that she had no choice at all and could only force herself to accept the reality.
Now, Jiang Ran can only stay here with the idea of taking it as it comes, waiting for the opportunity to return to the original world or spend the rest of his life in the world in this book. After all, it is better to die than to live. Who wants to die if he can live?
The only thing worth celebrating is that although this is a world in a novel, looking at all the books she has read, the basic social situation is quite different from reality.
If she traveled to ancient times, Jiang Ran felt that according to her IQ, surviving for three days, let alone three episodes, would be considered a big deal. Or maybe she traveled back in time to a war-torn era, and she was probably killed by a bomb as soon as she opened her eyes.
Now, it can be considered a blessing among misfortunes.
After all, it was a peaceful era, at least the time span was not long, and at least she was wearing a beautiful woman with a delicate body and a soft body!
Thinking about it this way, Jiang Ran felt good about herself after accepting the setting of wearing a book.
Under normal circumstances, the book wearer has a task, either to defeat the male protagonist, or to defeat the villain, or to let the sad heroine HE, the sweet heroine BE... Of course, the corresponding book wearer will have certain privileges. For example, the binding system or various cheats.
She has no system.
There doesn't seem to be any cheats at the moment.
There is no task for her to complete...
Jiang Ran, who was familiar with all kinds of novel plots, was a little confused at this time, so why was she wearing a book? There's no way he sent her here specifically to fall in love, right?
However, none of this matters now.
When a car reaches the mountain, there will be a road, and when a boat reaches the front, it will naturally go straight. Now she might be able to... um... cope with the changes by staying the same, and just let nature take its course.
Jiang Ran packed up the leftover takeout. As a food lover, he subconsciously paused for a few seconds to write down the name of the store. The takeout from this store is delicious. I can order it again next time.
Full of wine and food, full of lust.
Now that Jiang Ran was full, she no longer thought about lust. Instead, she felt weak and hot all over. It was obviously symptoms of a cold and fever. When I first woke up, I was just panicking. Now that I have eaten and drank enough, I feel relaxed and something is wrong.
After rummaging around the house, I found cold medicine, mixed it with cold water, and drank it. I felt my body became hotter and hotter. I felt that the medicine had taken effect, so I ran back to the bed and lay down in a daze.
Jiang Ran originally thought that she would not be able to sleep after such an incident, but in fact, she felt her body tired while lying on the bed, and fell asleep soon after.
Jiang Ran would never admit that she was arrogant afterwards, and firmly believed that it was because of the cold medicine she drank, which may have contained sleeping ingredients, otherwise she would not have fallen asleep so quickly.
Jiang Ran was sleepy and groggy. She didn't know what night it was. Her door was gently opened from the outside. Someone came to her bed and stood there, looking closely at Jiang Ran's appearance. The face outside the quilt.
The visitor did not turn on the light in the room. He was startled when he saw the dense sweat on Jiang Ran's body through the light coming from outside. He wiped the sweat on her face with a handkerchief and took a thermometer to measure it. He coaxed the dizzy Jiang Ran to drink the medicine, and then tiptoed out.
At eight o'clock the next day, everyone in the other two rooms had packed up and prepared to go out, but Jiang Ran still made no move.
Xia Yun glanced at Jiang Ran's closed door and said, "Sister Zilin, is Xiaoran still not well?"
"Well, I still had a fever when I went to see her last night and my body was covered in sweat. I've already told Sister Hui, and Sister Hui said to let her sleep a little longer today and wait until she wakes up naturally before going to the company."
"Oh." Xia Yun nodded after hearing this, and said while changing her shoes at the entrance, "I saw that she was in good health before, but this time the cold was so serious, and she still has a fever for two days, otherwise she would have better go to the hospital. See, just taking cold medicine won’t help.”
"The last time I went to the hospital, I couldn't get out for even a few hundred dollars. It's better to wait and see. If it really doesn't work, then wait. Maybe I'll be fine today after sweating last night."
The two of them deliberately lowered their voices when talking and walked out of the room.
Hearing the sound of the door slamming, Jiang Ran was still lying on the bed without moving.
Although Xia Yun and the others tried their best to lower their voices, they still inevitably woke her up. It's just that she didn't have the memory of the original owner, and she hadn't decided how to face them for a while, so she pretended to be dead and lay on the bed without moving. When she heard Zhou Zilin say that she didn't have to go to the company today, she couldn't help but breathed a sigh of relief. .
However, from their words, it can be heard that the relationship between his teammates is still good. Finally, there are no messy grudges to deal with, which Jiang Ran is very satisfied with.
Jiang Ran lay there and let her thoughts wander for a while, her stomach growling with hunger. This feeling of hunger made her very uncomfortable, and she slowly got up from the bed.
Halfway through the climb, Jiang Ran suddenly paused and sat back down. She took the phone from the bedside and carefully looked through the photos inside and the data in the app.
The original owner seemed to have the habit of keeping a diary, and there were many daily matters recorded by her in the notes. Through the information on her mobile phone, Jiang Ran also had a deeper understanding of the original owner.
Jiang Ran, who was looking through the records on her phone, couldn't care less about her stomach. She kept looking through the records and finally stopped at the note record from five months ago.
Jiang Ran covered her stomach with her hands, feeling that she was about to starve to death, but that was not the focus at the moment. The focus was on the trainee contract she signed with the company five months ago.
Trainee contract? !
Jiang Ran murmured these words again, and then turned them around in her mind to try to recall them. Suddenly, her temples tingled, and her thoughts kept beating. The pain came suddenly. Jiang Ran grimaced in pain and slowly closed her eyes. Several unfamiliar scenes flashed through her mind.
One scene is in a conference room. There is a woman sitting across from the desk. "I" sit opposite the woman, pick up a pen and sign my name on a printed paper.
One is "self" holding the contract and dragging her suitcase and followed the woman who signed the contract with her into the room, where she lives now.
This is the memory of the original owner.
So, as long as she tried her best to recall, she could recall the detailed memories of the original owner?
Jiang Ran wrote this down first, and then rummaged around the room following the memory of the original owner described in the book. After about ten minutes, he finally found what he wanted. After roughly flipping through the trainee contract in her hand, Jiang Ran couldn't help but curse.
This contract is simply a contract of sale.
Room and board are included, but food is not included. The base salary is only 3,000, and the commission is 3%. The key point is that the contract period is five years. Everything about the artist's planning is very formal and formal. It's several pages long and makes people feel dizzy. Jiang Ran is not a professional in this industry and can't understand it very well. Whenever he reads it, he quickly skips it. Only the penalty for liquidated damages is clear and clear at a glance.
In case of breach of contract, compensation of 3 million yuan will be required.
Hold!
Is this leather bag company specifically making money by terminating contracts? !
Is it too late for her to take back her praise of Cao Hui yesterday?
I have long heard that money in the entertainment industry is worthless. From time to time, the father of the country exposed some cases of tax evasion by celebrities and Internet celebrities. The calculated amounts were always in hundreds of millions. She, who was fishing at work, felt sour when she saw these news. She has become a lemon spirit. When she was seriously suspicious of inflation, she was the only one who forgot about her. Otherwise, why would everyone’s measurement unit be billions, but when she buys instant noodles in the supermarket, she chooses a bag of 2.5 yuan or a bucket of 4.5 yuan. I can still be confused for a long time!
But I never expected that a small company that was hundreds of years old and had not even touched the threshold of the entertainment industry would sign trainees with such high liquidated damages!
In reality, she didn't know that she had never been exposed to it, but in the many entertainment novels she had read, many heroines and supporting characters could not afford the liquidated damages and were forced to stay in the original company to wait for the contract to expire, during which they had to be harassed in various ways. Squeeze, the people in the same company are arrogant and submissive.
After closing the contract, Jiang Ran began to think, is this disproportionate contract of prostitution valid?


